Condensing Unit Install Kit Includes DL579, RLD15B, HUB8, AC550
This kit provides the recommended test instruments required by condensing unit start up manuals for proper installation and maintenance. Most equipment warranties require initial install readings to be documented upon installation.
510KIT is packed in this UEi Tool Backpack, which is built rugged with a waterproof base and features two compartments with inner pockets and an included D-clip.
This equipment helps confirm:
Manufacturer requirements to maintain warranty
System is free from refrigerant leaks
Proper high voltage to power supply and ground
Low voltage meets wiring diagram requirements
Evacuation Suction & Liquid valves
Temperatures of Suction & Liquid lines
Superheat and Subcool values for adjustments