Gas Furnace Install Kit Includes DL579, CD100A, EM720SPKIT, PDT655, COA2, AC550
This Kit provides the recommended test instruments required by Gas Furnace start up manuals for proper installation and maintenance. Most equipment warranties require initial install readings to be documented upon installation.
521KIT is packed in this UEi Tool Backpack, which is built rugged with a waterproof base and features two compartments with inner pockets and an included D-clip.
This equipment helps confirm:
Manufacturer requirements to maintain warranty
Safe Carbon Monoxide levels
CFM via external static pressure test
Gas flow pressure
System is safe from gas leaks
Proper high voltage to power supply and ground
Low voltage meets wiring diagram requirements